top of page

ADAPTING TO SOMETHING NEW · NPD

New Product Launch Supply Chain

Sourcing, capacity, packaging and distribution checked before the launch date, not discovered after it.

Category:

Adapting to something new

Category:

Adapting to something new

YOU ARE PROBABLY HERE BECAUSE

What you get

The launch turned into supply terms: volumes, timings, specification, packaging, and the service the customer actually needs rather than the headline figure. A capacity check: whether you can make it, at that rate, alongside everything else you make, and what the changeovers really cost. A sourcing plan with lead times, minimum order quantities and every single point of failure named. A launch plan with checkpoints and go or no-go dates. And both volume cases costed, so you know what happens if it comes in at half or at double.

Who it is for

Commercial and technical teams with a listing won, a launch date fixed and the supply side still untested.

Related services

PROC, OPS.

“We've won a listing and nobody has tested the supply chain against it.”

“The launch volume is a forecast nobody has stress-tested either way.”

“The last launch went out late, short, and at a cost nobody predicted.”

bottom of page